Phases
Planning
3 steps · ~13d
Permitting
2 steps · ~2d
Construction
8 steps · ~29d
Completion
4 steps · ~9d
Quick Stats
Every template is a free step-by-step checklist with typical durations, costs, and Long Beach city contacts. Sign up free to turn any of them into a live build tracker.
Full Rehab
Complete 45-step full home rehab playbook for Long Beach: permits, demolition, framing, electrical, plumbing, inspections, and finish work — with typical costs and a ~253-day timeline.
ADU Build
How to build an ADU in Long Beach: a free 49-step playbook covering city permitting, utility connections, construction, and inspections — with typical costs and a ~173-day timeline.
SB-9 Lot Split
The California SB-9 lot split process in 32 steps: entitlement, survey, design, permitting, and dual-unit construction — with typical costs and a ~271-day timeline for Long Beach lots.