How to run a full home rehab in Long Beach, step by step. This free checklist breaks the entire renovation into 45 steps — from due diligence and city permits through demolition, construction, inspections, and final sign-off — each with typical durations, costs, and who to call.
This playbook is a starting point — add, remove, or reorder any step when you start your project.
Title Search & Preliminary Report
Order title search to identify liens, easements, and encumbrances.
Property Inspection
Full property inspection — structural, electrical, plumbing, roof, foundation.
Develop Scope of Work
Create detailed scope of work based on inspection findings and your renovation plan.
Obtain Contractor Bids
Get 2-3 bids from licensed GCs based on your scope of work.
Hire Architect & Start Plans
Engage architect to draft architectural plans for the renovation.
Structural Engineering
Structural engineer to provide calcs and details for any structural modifications.
Title 24 Energy Compliance
Energy calculations and compliance documentation required by California Title 24.
Soils Report (if required)
Geotechnical investigation for foundation work or hillside properties.
Finalize Plan Set for Submittal
Compile complete plan set: architectural, structural, Title 24, and any required reports.
Submit Plans to LB Development Services
Submit complete plan set for plan check review.
Plan Check Review
City reviews plans for code compliance. Currently averaging 9-10 weeks.
Address Plan Check Corrections
Review corrections from plan check, have architect/engineer revise plans, resubmit.
Permit Issuance & Fee Payment
Once plans are approved, pay remaining permit fees and pick up the permit.
Request Water Meter Set (LBWD)
Apply for new water meter or service upgrade with Long Beach Water Department.
Request Electrical Service (SCE)
Apply for new electrical service or panel upgrade with Southern California Edison.
Request Gas Service (SoCalGas)
Apply for gas meter set or service connection with SoCalGas.
Order Long-Lead Materials
Order windows, cabinets, specialty items, and any materials with long delivery times.
Set Up Dumpster & Job Site
Order dumpster, set up temporary fencing, porta-potty, and job site signage.
Hazardous Material Testing
Test for asbestos and lead paint (required for pre-1978 homes).
Interior Demolition
Selective or full interior demolition per scope of work.
Debris Hauling & Cleanup
Remove demolition debris and prepare for construction.
Foundation Work
Foundation repairs, new footings, or slab work as specified in structural plans.
Framing
Structural framing — walls, headers, roof structure per plans.
Windows & Exterior Doors
Install new windows and exterior doors.
Rough Plumbing
Rough-in all plumbing supply and drain lines.
Rough Electrical
Rough-in all electrical wiring, boxes, and panel.
Rough HVAC
Install HVAC ductwork, equipment rough-in, and refrigerant lines.
Insulation
Install wall and ceiling insulation per Title 24 requirements.
Drywall
Hang, tape, and finish drywall throughout.
Interior Paint
Prime and paint all interior walls, ceilings, and trim.
Flooring Installation
Install all flooring — hardwood, tile, LVP, or carpet.
Cabinet & Countertop Installation
Install kitchen and bathroom cabinets and countertops.
Finish Plumbing
Install fixtures — sinks, faucets, toilets, shower valves, water heater.
Finish Electrical
Install outlets, switches, light fixtures, and cover plates.
Exterior Work & Landscaping
Exterior paint, siding repair, hardscaping, and basic landscaping.
Foundation Inspection
City inspection of foundation work before concrete pour.
Framing Inspection
City inspection of framing, shear walls, hold-downs, and structural connections.
Rough Inspections (Plumbing, Electrical, Mechanical)
City inspection of all rough-in work before walls are closed.
Insulation Inspection
City inspection of insulation installation per Title 24 requirements.
Final Inspection
Comprehensive final inspection of all completed work.
Certificate of Occupancy
Receive Certificate of Occupancy (CO) after final inspection passes.
Final Cleaning
Professional deep clean of the entire property.
Punch List Walkthrough
Walk the property and document any remaining items needing attention.
Final Documentation & Photos
Take final photos, compile all permits/inspections, and organize project documentation.
Project Closeout
Final contractor payments, lien releases, and project financial reconciliation.
Phases
Planning
4 steps · ~25d
Design
5 steps · ~61d
Permitting
4 steps · ~83d
Pre-Build
5 steps · ~114d
Demolition
3 steps · ~15d
Construction
14 steps · ~94d
Inspections
6 steps · ~17d
Completion
4 steps · ~12d
Quick Stats
Every template is a free step-by-step checklist with typical durations, costs, and Long Beach city contacts. Sign up free to turn any of them into a live build tracker.
ADU Build
How to build an ADU in Long Beach: a free 49-step playbook covering city permitting, utility connections, construction, and inspections — with typical costs and a ~173-day timeline.
SB-9 Lot Split
The California SB-9 lot split process in 32 steps: entitlement, survey, design, permitting, and dual-unit construction — with typical costs and a ~271-day timeline for Long Beach lots.
Cosmetic Flip
Fast 17-step cosmetic flip checklist — paint, flooring, kitchen, and bathroom refresh — optimized for 30-day turnarounds in Long Beach, with typical costs and a ~32-day timeline.